References
OUR MAIN REFERENCES AS OF 12/31/2024
1 - EXECUTION OF WORKS
- 2024: Company ADF: Execution of assembly and piping works on static equipment and columns during the shutdown of TOTAL FEYZIN ALKYLATION.
- 2024: Company ADF: Execution of assembly and piping works on static equipment and columns during the shutdown of TOTAL LA MEDE.
- 2024: Company EMIS: Execution of assembly and metallurgy works on static equipment and columns during the shutdown of ARKEMA LACQ.
- 2024: Company PONTICELLI: Execution of dismantling works on static equipment at EDF LA MAXE plant.
- 2024: Company EMIS: Execution of assembly works on static equipment and columns during the shutdown of TOTAL GRANDPUITS PIROLYSE.
- 2024: Company FORCE: Execution of assembly works on static equipment at COVESTRO ANTWERP plant.
- 2024: Company CLEMESSY: Execution of assembly works on static equipment and columns during the shutdown of SYENSQO TAVAUX.
- 2024: Company ORTEC: Execution of assembly and metallurgy works on static equipment during the shutdown of CIMENT CALCIA COUVROT.
- 2024: Company EMIS: Execution of assembly and metallurgy works on static equipment and columns during the shutdown of ESSO FOS SUR MER.
- 2024: Company FORCE: Execution of assembly and piping works on static equipment and columns during the shutdown of EXXON ROTTERDAM.
- 2024: Company ENDEL: Execution of assembly works on static equipment at SAIPOL SETE plant.
- 2024: Company FOSELEV: Execution of assembly works on static equipment and columns during the shutdown of ARKEMA MONT (64).
- 2024: Company PONTICELLI: Execution of assembly works on static equipment and columns during the shutdown of INNOVYN TAVAUX.
- 2024: Company EMIS: Execution of internal column assembly works during the shutdown of VARO ENERGY CRESSIER.
- 2024: Company FORCE: Execution of assembly and metallurgy works on static equipment and columns during the shutdown of BASF ANTWERP.
- 2024: Company PONTICELLI: Execution of pipe support replacement works during the APOLON project at ELENGY MONTOIR DE BRETAGNE plant.
- 2024: Company FORCE: Execution of assembly works on static equipment and columns during the shutdown of BOREALIS ANTWERP.
- 2024: Company FORCE: Execution of assembly works on static equipment and columns during the shutdown of NYRSTAR BALEN.
- 2024: Company RS: Execution of dismantling/reassembly of valves in workshop at VITROLLES.
- 2024: Company BOCCARD: Execution of piping and line assembly works during NH3 project at ARCELOR DUNKERQUE plant.
- 2024: Company ADF: Execution of assembly works on static equipment during the shutdown of TOTAL DONGES.
- 2024: Company FOSELEV: Execution of assembly works on static equipment and columns during the shutdown of MICHELIN BASSENS.
- 2024: Company PONTICELLI: Execution of piping works for microelectronics project at MICRO ST CATANE plant.
- 2024: Company PMM: Execution of assembly works on static equipment during the shutdown of ARCELOR MARDYCK.
- 2024: Company PONTICELLI: Execution of assembly works on static equipment and columns during the shutdown of BOREALIS GRAND QUEVILLY.
- 2024: Company FORCE: Execution of assembly works on static equipment and columns during the shutdown of EUROCHEM ANTWERP.
- 2024: Company PONTICELLI: Execution of assembly works on static equipment and columns during the shutdown of AFYREN SAINT AVOLD.
- 2024: Company ADF: Execution of metallurgy works during NORSKE EPINAL project.
- 2024: Company ENDEL: Execution of boiler metallurgy works during the shutdown of VEOLIA BOURGOIN.
- 2024: Company PONTICELLI: Execution of metallurgy and piping assembly works during VERKOR DUNKERQUE project.
- 2024: Company PONTICELLI: Execution of assembly works on static equipment and columns during the shutdown of ARKEMA CARLING.
- 2024: Company PONTICELLI: Execution of piping works during the shutdown of SUCRERIE GRAND QUEVILLY.
- 2024: Company ENDEL: Execution of piping prefabrication works in workshop at NOYELLES LES SECLIN.
- 2024: Company EMIS: Execution of assembly works on static equipment and columns during the shutdown of TOTAL LA MEDE.
- 2024: Company MIP INDUSTRIE: Execution of metallurgy assembly works during the shutdown of APERAM DUNKERQUE plant.
- 2024: Company PONTICELLI: Execution of assembly works on static equipment and columns during the shutdown of YARA GONFREVILLE.
- 2024: Company PONTICELLI: Execution of assembly works on static equipment and columns during the shutdown of NESTLE DIEPPE.
- 2024: Company ENDEL: Execution of assembly works on static equipment and columns during the shutdown of ARKEMA FEUCHY.
- 2024: Company PONTICELLI: Execution of structural frame assembly works at RENAULT SANDOUVILLE plant.
- 2024: Company PONTICELLI: Execution of assembly works on static equipment and columns during the shutdown of ARKEMA VILLERS ST PAUL.
- 2024: Company EMIS ACCESS: Scaffolding assembly during shutdown of TOTAL LA MEDE.
- 2024: Company EMIS ACCESS: Scaffolding assembly during ARKEMA LACQ project works.
- 2024: Company EMIS ACCESS: Scaffolding assembly during shutdown works at TOTAL GRANDPUITS PIROLYSE plant.
- 2024: Company EMIS ACCESS: Scaffolding assembly during shutdown works at KEMONE FOS SUR MER plant.
- 2024: Company EMIS ACCESS: Scaffolding assembly during shutdown works at OXOCHIMIE LAVERA plant.
- 2024: Company PONTICELLI: Execution of metallurgy works during shutdown of VERSALIS DUNKERQUE.
- 2024: Company EMIS: Execution of assembly works on static equipment and columns during shutdown of ALSACHIMIE HND.
- 2024: Company FORCE: Execution of metallurgy works during shutdown of TOTAL ANTWERP.
- 2024: Company ADF: Execution of piping prefabrication works in workshop at ROGNAC.
- 2024: Company PONTICELLI: Execution of metallurgy works during KALLO BOREALIS ANTWERP project.
- 2024: Company PONTICELLI: Execution of metallurgy works during shutdown of EUROAPI SAINT AUBIN.
- 2024: Company RS: Execution of valve removal/reinstallation works during shutdown of ESSO FOS SUR MER.
- 2024: Company EMIS: Execution of assembly works on static equipment and columns during shutdown of KEMONE FOS SUR MER.
- 2024: Company CIMAT SARTEC: Execution of assembly works on static equipment and columns during shutdown of KEMONE ST FONS.
- 2024: Company PONTICELLI: Execution of assembly works on static equipment and columns during shutdown of ARCELOR DUNKERQUE DK6.
- 2024: Company PONTICELLI: Execution of assembly works on static equipment and columns during shutdown of VENCOREX PONT DE CLAIX.
- 2024: Company EMIS: Execution of metallurgy works during PIROLYSE project at TOTAL GRANDPUITS.
- 2024: Company TOTAL: Execution of cleaning and passivation works during shutdown of TOTAL RN DHC.
- 2023: Company PONTICELLI: Execution of metallurgy works during shutdown of ISLAND ALIZE.
- 2023: Company ADF: Execution of assembly works on static equipment and columns during shutdown of ESSO FOS SUR MER.
- 2023: Company ADF: Execution of metallurgy works during PRIMETAL DUNKERQUE project.
- 2023: Company PONTICELLI: Execution of metallurgy works during EOLMED project.
- 2023: Company SOLVAY: Execution of rotary dryer tube bundle retubing works at DOMBASLE plant.
- 2023: Company SOLVAY: Execution of replacement of 2 monorails at DOMBASLE plant.
- 2023: Company SOLVAY: Execution of prefabrication and on-site replacement of a vacuum line at DOMBASLE plant.
- 2023: Company NYRSTAR: Execution of metallurgy works during shutdown of AUBY plant.
- 2022: Company ADF: Execution of assembly works on static equipment and columns during shutdown of LYONDELL BASEL BERRE PE/PP.
- 2022: Company ADF: Execution of assembly works on static equipment and columns during shutdown of LYONDELL BASEL BERRE EBD/DIB.
- 2022: Company ADF: Execution of works on column DA101 during shutdown of PETROINEOS D5.
- 2022: Company ADF: Execution of assembly works on static equipment and columns during shutdown of TOTAL FEYZIN.
- 2022: Company ADF: Execution of MAD works during shutdown of TOTAL FEYZIN.
- 2022: Company ORTEC: Execution of assembly works on static equipment and columns during shutdown of LYONDELL BASEL BERRE VAPO.
- 2022: Company ORTEC: Execution of assembly works on static equipment and columns during shutdown of LYONDELL BASEL BERRE PE/PP.
- 2022: Company ORTEC: Execution of assembly works on static equipment and columns during shutdown of LYONDELL BASEL BERRE EBD/DIB.
- 2022: Company ORTEC: Execution of assembly works on static equipment and columns during shutdown of TOTAL FEYZIN.
- 2022: Company PONTICELLI: Execution of assembly works on static equipment and columns during shutdown of TOTAL FEYZIN.
- 2022: Company PONTICELLI: Execution of assembly works on static equipment and columns during shutdown of ARKEMA CARLING.
- 2022: Company ADF: Execution of assembly works on static equipment and columns during the shutdown of TOTAL CARLING.
- 2022: Company BILFINGER: Execution of assembly works on static equipment and columns during the shutdown of BOREALIS GRANDPUITS.
- 2022: Company ERT: Execution of assembly works on static equipment and columns during the shutdown of BOREALIS GRANDPUITS.
- 2022: Company FOSELEV: Execution of assembly works on static equipment and columns during the shutdown of TOTAL DONGES D2E.
- 2022: Company PONTICELLI: Execution of assembly works on static equipment and columns during the shutdown of VENCOREX PONT DE CLAIX HDI.
- 2022: Company ERT: Execution of assembly works on static equipment and columns during the shutdown of VENCOREX PONT DE CLAIX CHLORE.
- 2022: Company PONTICELLI: Execution of assembly works on static equipment and columns during the shutdown of SOLVAY TAVAUX.
- 2022: Company AXENS: Execution of assembly works for the new CEVEN unit at AXENS SALINDRES plant.
- 2022: Company ORTEC: Execution of assembly works on static equipment and columns during the shutdown of LYONDELL BASEL ADDITIFS.
- 2022: Company EMIS ACCESS: Scaffolding assembly during the shutdown of LYONDELL BASEL BERRE VAPO.
- 2022: Company SMRI: Execution of valve dismantling/reassembly works in workshop during the shutdown of PETROINEOS CRU ISOM.
- 2022: Company CLEMESSY: Execution of assembly works on static equipment and columns during the shutdown of AIR LIQUIDE PONT DE CLAIX.
- 2022: Company FOURE LAGADEC: Execution of assembly works on static equipment and columns during the shutdown of TOTAL OUDALE.
- 2022: Company ADF: Execution of metallurgy works at the ADF workshop in ROGNAC.
- 2022: Company BOVIS: Execution of dismantling works of machining equipment for transfer to MONACO.
2 – TECHNICAL ASSISTANCE
- 2021: Company PETROINEOS LAVERA: Preparation and supervision of works on units HCK, ISOM, D5.
- 2020: Company PETROINEOS LAVERA: Preparation and supervision of works on units HCK, ISOM, D5.
- 2019: Company PETROINEOS LAVERA: Preparation and supervision of works on units HCK, VISCO.
- 2018: Company PETROINEOS LAVERA: Preparation and supervision of works on units DSV3, HCK, FCC.
- 2018: Company TOTAL LA MEDE: Preparation and supervision of dismantling works for the PHOENIX project.
- 2017: TOTAL LA MEDE Site: Monitoring shutdown works and continuous preparation of works for the integration of the PHOENIX project.
- 2017: Company APAVE INTERNATIONAL: Monitoring equipment fabrication for AREVA.
- 2017: Company PETROINEOS LAVERA: Preparation and supervision of works on units DSV2, HCQ.
- 2017: TOTAL LA MEDE Site: Preparation and monitoring of zero-energy shutdown works for the refinery’s East units.
- 2016: Company TOTAL NORMANDIE: Reception and assistance with pre-assembly of new column internals. KOCH GLISTCH Workshop, Rome, Italy.
- 2016: Company Air Liquide Normandie and Paris: Preparation of shutdowns on different sites and units.
- 2016: Company APAVE INTERNATIONAL: Monitoring equipment fabrication for AREVA.
- 2016: Company PETROINEOS LAVERA: Supervision of works during FCC shutdown.
- 2016: TOTAL LA MEDE Site: Preparation of 2017 shutdown works, integration of the PHOENIX project.
- 2015: Company Air Liquide Normandie and Paris: Preparation of shutdowns on different sites and units.
- 2015: TOTAL LA MEDE Site: Preparation of 2017 shutdown works, integration of the PHOENIX project.
- 2015: Company APAVE INTERNATIONAL: Monitoring equipment fabrication for AREVA.
- 2015: PETROINEOS LAVERA Site: Preparation of shutdowns for FCC, D5, and DSV3.
- 2015: AIR LIQUIDE TONKIN Site: Preparation and supervision of shutdowns of FOS SUR MER and ASCOMETAL units.
- 2014: APAVE INTERNATIONAL: Monitoring equipment fabrication for AREVA.
- 2014: VENCOREX PONT DE CLAIX Plant: Supervision of shutdown works.
- 2014: Company Air Liquide Normandie and Paris: Updating P&IDs and preparation of unit shutdowns.
- 2014: TOTAL LA MEDE Refinery: Supervision of works during the major shutdown.
- 2014: Company Air Liquide Nantes: Expertise of automatic valves during the shutdown.
- 2014: Company ADF: Preparation of works during TOTAL ZEELAND shutdown (Netherlands).
- 2014: Company EMIS PONTICELLI: Planning of the BUTACHIMIE shutdown.
- 2013: Company Air Liquide: Preparation of shutdown works. Creation of specifications for tenders and scheduling of works.
- 2013: TOTAL LA MEDE Refinery: Inspection of piping and equipment prior to shutdown.
- 2013: Company ENDEL: Scheduling and management of works during TOTAL FEYZIN shutdown.
- 2013: APAVE INTERNATIONAL: Monitoring equipment fabrication dossiers for ALSTOM POWER SERVICE LEVALLOIS.
- 2013: VENCOREX PONT DE CLAIX Plant: Preparation and monitoring of unit shutdown works.
- 2013: TOTAL LA MEDE Refinery: Preparation of major 2014 shutdown works.
- 2012: AIR LIQUIDE FOS SUR MER Plant: Preparation of shutdown works for a hydrogen production unit.
- 2012: TOTAL LA MEDE Refinery: Column expertise during shutdown works.
- 2012: ALSTOM Workshop GRENOBLE: Monitoring equipment fabrication for the nuclear sector.
- 2012: EIFFEL BERRE Agency: Preparation of regulatory files for piping repairs during NAPHTACHIMIE shutdown.
- 2012: APAVE INTERNATIONAL: Monitoring equipment fabrication for AREVA nuclear plants.
- 2012: TOTAL LA MEDE Refinery: Inspections during shutdown works.
- 2012: PONTICELLI GRENOBLE Agency: Preparation and monitoring of unit shutdown works.
- 2012: ADF TOTAL NORMANDIE Site: Column expertise during unit shutdown.
- 2012: TOTAL GRANDPUITS Refinery: Preparation of automatic valve works and monitoring workshop inspections.
- 2012: SANOFI SISTERON Plant: Preparation and monitoring of shutdown works.
- 2012: ALSTOM POWER SERVICE LE HAVRE: Non-destructive testing in workshop.
- 2012: AIR LIQUIDE FOS SUR MER Plant: Preparation of automatic valves for unit shutdown.
- 2012: HEURTEY PETROCHEM ROMANIA Plant: Monitoring fabrication of convection parts for TOTAL unit shutdown works.
- 2012: I-PAPER LIMOGES Paper Mill: Preparation of instrumentation works during plant shutdown.
- 2012: TOTAL LA MEDE Refinery: Supervision of shutdown works.
- 2011: INEOS FELUY Refinery (Belgium): Direction of shutdown preparation and responsible for shutdown works.
- 2010 & 2011: TOTAL LA MEDE Refinery: Inspection of piping and equipment prior to shutdown.
- 2011: EDF LE HAVRE Plant: Inspection of piping before and during unit outage.
- 2011: TOTAL FLUIDE LE HAVRE Plant: Inspection of piping prior to shutdown.
- 2011: AIR LIQUIDE FOS SUR MER Plant: Preparation of shutdown works for hydrogen production unit.
- 2011: RUBIS CARAIBES Oil Depot: Studies and planning of storage tank and associated piping network.
- 2011: TSI: Comprehensive expertise of a thermal power plant in Guinea Conakry for rehabilitation and modernization works.
- 2011: AIR LIQUIDE: Port Jérome, supervision of hydrogen furnace works during shutdown.
- 2011: TSI: Assistance for starting diesel engine in a thermal power plant in Guinea Conakry.
- 2011: KOCHK GLISTCH Site: Column expertise and assistance with internal assembly.
- 2011: HEURTEY PETROCHEM ROMANIA Plant: Monitoring fabrication of convection parts for TOTAL LA MEDE unit shutdown.
- 2011: PONTICELLI GRENOBLE Agency: Preparation and monitoring of shutdown works.
- 2010: Baretti POLIMERI DUNKERQUE Site: Assistance with assembly of column internals during shutdown works.
- 2010: SMRI MARTIGUES Agency: Expertise and management of automatic valve repairs during TOTAL LA MEDE and INEOS LAVERA unit shutdowns.
- 2010: PERSTORP PONT DE CLAIX Plant: Assistance with column internals assembly in diving suit.
- 2010: SMRI Site at POLIMERI DUNKERQUE Plant: Management of shipments and returns of valves to repair workshops during unit shutdown.
- 2010: TOTAL LA MEDE Refinery: Preparation of major 2012 shutdown works.
EQUIPMENT SUPPLY
Activity transferred to the Romanian subsidiary
- 2014: Company TEDD: Fabrication of light structure for R&D stainless steel device.
- 2014: Company TECMI: Supply of metal framework for the construction of 2 buildings of 700 m² each.
- 2014: TOTAL LA MEDE Refinery: Supply of stainless steel support beams and assembly parts for the furnace of the D5 unit of the refinery.
- 2014: TOTAL LA MEDE Refinery: Supply of piping for the commissioning of the SEM and EST units of the refinery.
- 2013: TOTAL LA MEDE Refinery: Supply of piping for the commissioning of the WEST units of the refinery.
- 2012: PONTICELLI GRENOBLE Agency: Fabrication and supply of stainless steel ducts for incinerator.
- 2011: TOTAL LA MEDE Refinery: Supply of piping for the commissioning of the units.
- 2011: ENDEL GRAND TRAVAUX Site: Fabrication and supply of a radiation bundle for a circular furnace for shutdown works.
3 – DISMANTLING OPERATIONS
- 2018: Port of CONSTANTA, ROMANIA: Deconstruction of 6 storage tanks.
- 2017: Port of CONSTANTA, ROMANIA: Deconstruction of 3 storage tanks.
- 2017: RAFO Plant, ROMANIA: Deconstruction of a production unit.
- 2016: RAFO Plant, ROMANIA: Deconstruction of 4 production units with sorting for recovery.
- 2016: Port of CONSTANTA, ROMANIA: Deconstruction of 7 buildings with metal structure.
- 2015: Port of CONSTANTA, ROMANIA: Deconstruction of a pumping station, 4 ship loading arms, and 3 storage tanks for slops.
- 2015: CHIMCOMPLEX BORZESTI Plant, ROMANIA: Deconstruction of a brick building, 2 buildings with metal structure, and 1 production unit.
- 2014: CHIMCOMPLEX BORZESTI Plant, ROMANIA: Deconstruction of metal structure buildings and 2 decommissioned units.
- 2014: RAFO Refinery, ROMANIA: Deconstruction of 3 units with sorting and material recovery.
- 2013: St Louis Sugar Company, Marseille: Deconstruction of 2 units.
- 2013: TOTAL LA MEDE Refinery: Unit dismantling.
- 2011: TOTAL LA MEDE Refinery: Unit dismantling.
MANUFACTURING OF PRESSURE EQUIPMENT
Activity transferred to the Romanian subsidiary
- 2014: Béta Company, Romania: Manufacture and supply of pressure vessels and columns.
- 2014: TOTAL LA MEDE Refinery: Manufacture and supply of an air exchanger.
- 2013: ECOSLPOS Company: Manufacture and supply of pressure equipment for a P2R unit in Portugal.
- 2013: TOTAL LA MEDE Refinery: Manufacture and fabrication of pressure vessels and columns.
MECHANICS
- 2024: CMI Company: Mechanical and machining workshop works at GRANDE SYNTHE.
- 2024: CIMAT SARTEC Company: Mechanical works at KEMONE ST FONS plant.
- 2024: PONTICELLI Company: Mechanical works at VENCOREX PONT DE CLAIX plant.
- 2024: PMM Company: Mechanical and valve works during shutdown at ARCELOR DUNKERQUE plant.
- 2024: PONTICELLI Company: Mechanical works at ARCELOR DK6 plant.
- 2024: PONTICELLI Company: Mechanical works at ISLAND ALIZE plant.
- 2024: ORTEC Company: Mechanical works at XEUILLEY (54) plant.
- 2024: BOCCARD Company: Mechanical works on-site at ARCELOR DUNKERQUE plant.
- 2024: PONTICELLI Company: Mechanical works at ARKEMA CARLING plant.
- 2024: CLEMESSY Company: Mechanical works during shutdown PRAYON (workshop and site) PEAGE DE ROUSSILLON.
- 2024: PONTICELLI Company: Mechanical works during KALLO BOREALIS ANTWERP project.
- 2022: ORTEC Company: Mechanical works at CLIRON 08 plant.
- 2022: PONTICELLI Company: Mechanical works at ARCELOR DUNKERQUE DK6 plant.
- 2022: PONTICELLI Company: Mechanical works at VENCOREX PONT DE CLAIX plant.
- 2022: TRONOX Company: Diagnostics works on crusher at THAN plant.
- 2022: PONTICELLI Company: Mechanical works at BOREALIS GRAND QUEVILLY plant.
- 2022: PONTICELLI Company: Mechanical works at ARKEMA VILLERS St PAUL plant.
- 2022: ORTEC Company: Mechanical works at CLIRON 08 plant.
- 2022: TRONOX Company: On-site machining works on washer at THAN plant.
- 2022: PONTICELLI Company: Mechanical works at SYNTHOMER RIBECOURT plant.
- 2022: PONTICELLI Company: Mechanical works at BOSTIK RIBECOURT plant.
- 2022: PONTICELLI Company: Mechanical works at Rhône dam.
- 2022: FONTES Company: Mechanical works at REVEL plant.
- 2022: SARTORIUS Company: Mechanical works at AUBAGNE AERO plant.
- 2022: PONTICELLI Company: Mechanical works at ARKEMA CARLING plant.
- 2022: CLEMESSY Company: Mechanical workshop works in GRENOBLE.
- 2022: TRONOX Company: Ultrasonic testing on centrifuge KM5 at THAN plant.
- 2022: TRONOX Company: On-site machining works on centrifuge KM5 at THAN plant.
- 2022: TRONOX Company: Mechanical works on crusher STEIN at THAN plant.
- 2022: PONTICELLI Company: Mechanical works during shutdown TOLONATE at VENCOREX PONT DE CLAIX plant.
- 2022: BOCCARD Company: Mechanical works at ARCELOR BASSE INDRE plant.
- 2022: CLEMESSY Company: Mechanical workshop works at PEAGE DE ROUSSILLON.